DECISION INTELLIGENCE

Decisions,
De-Risked.

Feasibility, risk, valuation and carbon — scored and ready to act on.

Intelligence means nothing if no one acts on it. These decision artefacts turn FHIP research into scores, verdicts and reports — run first for the group's own projects, then delivered to owners through Cyberate Project Management. One score. A person who signs it.

Feasibility Scorecard

Parramatta Site A

ID: DA-2026-0892
78
/100
Approval Risk Low
Est Cost A$480/m²
Timeline 20 months
Key Risk: Supply Chain
+10% Contingency

Five Decisions. One Question Each.

Decision artefacts built on FHIP research — run for the group's projects, and for owners through Cyberate Project Management.

Service 01

Development Feasibility

"Can I build on this site? How long? How much?"
What You Get
  • →Feasibility score (0–100 scale)
  • →Detailed site assessment (soils, constraints)
  • →Construction cost estimate
  • →Timeline estimate with confidence bands
  • →Risk flags (supply chain, climate)
Sample Output
Score: 78/100 Cost: A$450–520/m² (illustrative) Timeline: 18-24m
DeliveryReport (30 pages) + API
Engaged viaCyberate PM
How owners get this

Delivered through Cyberate PM, part of the DDDI Group.

Service 02

Risk & Defect Assessment

"What can go wrong? How likely? What's the cost?"
What You Get
  • →Hazard identification (site, design, construction)
  • →Probability scoring (0–100% likelihood)
  • →Cost impact range scenarios
  • →Mitigation strategies from similar projects
Sample Output
Risk: Contamination Prob: 15% Cost Impact: A$500k
DeliveryReport + Live Dashboard
Engaged viaCyberate PM
How owners get this

Delivered through Cyberate PM, part of the DDDI Group.

Service 03

Valuation & Market Analysis

"What's the market likely to support? What's realistic demand?"
What You Get
  • →Market demand outlook (5–10 yr)
  • →Comparable property analysis
  • →Absorption outlook
  • →Scenario & sensitivity analysis
Sample Output
Demand: 340 units/yr absorption Comps: 18 matched sales Sensitivity: 3 scenarios modelled
DeliveryReport + Excel Models
Engaged viaCyberate PM
How owners get this

Delivered through Cyberate PM, part of the DDDI Group.

Service 04

Carbon & Energy Assessment

"What's the climate impact? Can I meet green targets?"
What You Get
  • →Embodied carbon score (kg CO₂-e/m²)
  • →Operational carbon annual emissions
  • →Compliance check vs Scope 3 mandates
  • →Certification pathways (5-Star / Net-Zero)
Sample Output
Embodied: 45 kg CO₂-e/m² Recycled scenario: -18%
DeliveryReport + Material Specs
Engaged viaCyberate PM
How owners get this

Delivered through Cyberate PM, part of the DDDI Group.

Service 05

Opportunity Intelligence

"Which sites should I be looking at? Where's the upside?"
What You Get
  • →Opportunity scoring (feasibility + demand)
  • →Market gap analysis
  • →Site recommendation engine (top 10 matches)
  • →Competitive landscape timelines
Sample Output
Top Match: Dulwich Hill Score: 84/100 Window: 2026-27
DeliveryBrief + Market Briefing
Engaged viaCyberate PM
How owners get this

Delivered through Cyberate PM, part of the DDDI Group.

FEASIBILITY, TESTED THREE WAYS

Approvable. Buildable. Bankable.

A site only stacks up when all three hold. We test each one on evidence — then say so plainly.

01

Approvable

Will the consent authority approve it — and how long will it take? Assessment pathway, overlays, referrals and notification, read at register scale before design starts.

02

Buildable

Can it actually be delivered to programme and cost? Layout, staging, materials and trade sequencing checked against how the group builds today.

03

Bankable

Does the money work? The full development priced line by line — margin on cost, and how it holds when the sale price moves.

INVESTMENT VERDICT

The whole project, priced before you commit.

A feasibility is arithmetic with consequences. Our model prices the whole development — acquisition, statutory charges, construction, finance and sales — line by line, then reports net profit, margin on cost, and what happens when the sale price moves ±8%. Press play to watch a project price itself.

Project feasibility · the whole development priced line by line
A condensed extract of the 40+ line-item model. Illustrative pattern — every figure is generated and rounded; not a quote, valuation or current fee schedule.
  • Acquisition
  • Statutory
  • Construction
  • Finance & holding
  • Sales

Illustrative model — indicative line items and sensitivity, shown to demonstrate the method, not a live project appraisal.

Transparency

Here's What An Illustrative Report Looks Like.

A sample structure of our feasibility reports. Data-driven, structured, transparent methodology, 30–40 pages. You get a number you can act on, not just an opinion.

Illustrative
Table of Contents
1. Site Assessment8 pages
2. Construction Cost Estimate6 pages
3. Market & Valuation5 pages
4. Risk & Mitigation4 pages
5. Recommendations2 pages

See It In Practice

These reports run inside a client-side development management engagement
Via Cyberate PM
New to the method behind the feasibility score? Start with our guide to property development feasibility in Australia, which sets out the sequence from planning controls to a bankable result.
How It Reaches You

Not A Storefront.

For the group

Every DDDI development and investment decision runs on these artefacts first. We eat our own cooking.

Intelligence in the framework →

For owners

Landowners, project owners and investors receive these reports inside a fixed-fee, client-side engagement with Cyberate Project Management.

How Cyberate PM works →

For government & research

Agencies and universities work with the underlying research and data through partnership, not purchase.

Partner with us →
Why no price listDDDI doesn’t sell products. Scope, delivery and fees for owner engagements are agreed with Cyberate PM at kick-off, fixed and in writing.
REPORT BOUNDARIES

Every report states what it does not do.

A report you can rely on is one that names its own boundaries. Ours do — on the first page, not in the fine print.

Evaluates market value only

It prices the asset in its market. It does not promise what you will make from it.

States its cost basis

Where development costs are excluded, the report says so instead of implying they were modelled.

Uses recorded building areas

Figures come from recorded data, not assumed dimensions — and the source is named.

Publishes its own reliability

Each report carries the model’s confidence and the data coverage behind it.

Is not a valuation

It is decision intelligence. Where a formal valuation is required, we say so.

2
Report tiers
40+
Cost line items modelled
3
AI valuation models
±8%
Price scenarios tested

Feasibility reports draw on verified transaction records across metropolitan South Australia. The model is not where projects are lost — the boundaries are, which is why every report names them.

Decisions, Not Products.

The group runs on this intelligence every day. If you want it behind your own project, it comes with a development manager attached.

Get Trade Quotes